June 16, 2009...2:06 pm

Daniel Libeskind designs prefab

Jump to Comments

Daniel Libeskind

Daniel Libeskind’s recent project, a series of signature prefabricated homes, is a drastic change from his usual commissions. Although a smaller project (5,500 square foot), the residence strongly speaks his language of design with drastic angles, strong geometries and seamless transitions between spaces.  In this ever-growing age of prefab dominance, Libeskind’s villas will be able to be shipped to almost any location in the world within months, and will be assembled on site by a team of experts within weeks.

Full article via Architecture Daily

1 Comment

  • For Libeskind, LEED is just another marketing ploy to sell the same old idea he has been cranking out for years. But I doubt Libeskind even knows what the LEED acronym signifies.

    In Manchester, Libeskind’s Imperial War Museum was singled out to receive the UK’s worst possible energy rating, and was declared an abysmal energy guzzler.

    Here, the wasteful surface area to volume ratio is the first give away that energy was not really on Libeskind’s mind when he “designed” this. And not knowing the location, the siting, the orientation or the local climate, how responsible to energy needs can it be anyway. Take the very large window areas. Depending on the site they could end up facing north or south with potentially disastrous results for heat gain or heat loss.

    This project is bogus on so many levels it is a joke. But then so is Libeskind himself.


Leave a Reply